Bathroom
The rooms exposed repeatedly to short-time moisture, splashing water, shall be water-proofed thoroughly to prevent water from penetrating the ground (concrete, masonry, gypsum plasterboard) and thus damaging the joints between an adhesive and the ground or in the ground. For these areas it is necessary to observe the recommended procedures and composition of materials.

Legend:
| 1 | Penetration *) |
| 2 | Insulation |
| 3 | Insulation tape |
| 4 | Adhesive **) |
| 5 | Ceramic wall and floor tiles |
| 6 | Jointing material ***) |
| 7 | Silicone #) |
*) Alternative: PE 201
**) Alternative: AD 509 PLUS
***) Alternative: GF
#) Base Preparation Cord PES - It is to be inserted into working joints before application of flexible sealing materials. It optimises the shape of sealing cement in a joint, prevents undesired adhesion of cement to the joint bottom, and thus significantly increases its lifetime and effectiveness...
